In Australia, the Liberty International Risk Services offices have been successfully using an unusual, perhaps even unique, approach to risk assessments. They call the technique "Workplace Risk Assessment and Control" (WRAC). It is a participative qualitative risk assessment focused on the worker rather than on the process.

In general, it is similar to HAZOP and the requirements of the OSHA process safety management standard, but with some twists. Jim Joy, a Canadian who emigrated to Australia, refined the technique from earlier systems safety approaches used in Canada and the U.S.

WRAC Phases

The method consists of many different steps, but essentially three main phases. The first is the scoping session. This.is where the scope of the risk assessment is developed, the team selected and the risk levels of concern defined. The second phase is the risk assessment, in which the team performs a qualitative risk analysis within the scope defined in the first phase. The final phase is the client or management review, where corrective actions are evaluated based on their impact on reducing risk as defined by the team.

The WRAC technique is an approach that will be familiar to those in systems safety. The approach is, in part, based on the examination and control of releases of unwanted energy. The overall concept of unwanted energy release and hazards control came from work in the nuclear industry on "Management Oversight Risk Tree," or MORT, developed in the 1970s.

What is most interesting about the WRAC approach is the use of a relative risk ranking technique using a team approach. The team approach is also used to suggest control measures as well as define acceptable risk. Risk assessment is being used by an increasing number of safety and health professionals, and one that allows workers to help define acceptable risk should be of particular interest in team-based environments.

In the remainder of this article, I will quickly provide an overview of the WRAC methodology using a simple example of the replacement of a mechanical press with a newer and faster hydraulic press in a factory making small parts.

Scoping the Work

The first step in the process is the scoping phase. It could be done by a single individual with training in the WRAC approach (e.g., a health and safety professional), a management group or others familiar with the WRAC process. The scoping phase consists of identifying risks of concern to be evaluated. This is followed by defining the work objective, the risk ranking, acceptability of risk and expected outcomes from the study. Based on this work, a risk assessment team is established and a scoping document prepared.

For example, a scoping document might be prepared which involves the replacement of an old mechanical press with a new, faster hydraulic press. The scope document (typically a single-page form) might state the work objective as the assessment of potential risks involved with the installation and use of the new press. The scoping document would also identify the amount of time anticipated for the completion of the risk assessment (estimated in this scenario at two days), acceptable risks levels and the outcome expected of the WRAC process.

The expected outcome in this example would be a list of actions that could be taken to reduce risk in the operation of the new press (to include safe work practices). Acceptable risk is developed from a set of tables using a "five-by-five" risk ranking matrix. The risk ranking elements are shown below:

Probabilities:

A - Common or repeating occurrence

B - Known to occur or has happened

C - Could occur

D - Not likely to occur

E - Practically impossible

Consequences:

People:

1 - Fatality or permanent disability

2 - Serious lost time injury or illness

3 - Moderate lost time injury or illness

4 - Minor lost time injury or illness

5 - No lost time

Equipment, assets or production (note this listing could include environmental effects):

1 - More than $500K damage or equivalent cost for production delays

2 - $100K to $500K damage or equivalent cost for production delays

3 - $50K to $100K damage or equivalent cost for production delays

4 - $5K to $50K damage or equivalent costs for production delays

5 - Less that $5K damage or equivalent cost for production delays

The risk values are found in the table below by choosing the proper probability column (A-E) and then going across the consequence rows (1-5) in the left column.

The rest of this article is only available to active members of Questia

Sign up now for a free, 1-day trial and receive full access to:

  • Questia's entire collection
  • Automatic bibliography creation
  • More helpful research tools like notes, citations, and highlights
  • Ad-free environment

Already a member? Log in now.

Notes for this article

Add a new note
If you are trying to select text to create highlights or citations, remember that you must now click or tap on the first word, and then click or tap on the last word.
One moment ...
Project items

Items saved from this article

This article has been saved
Highlights (0)
Some of your highlights are legacy items.

Highlights saved before July 30, 2012 will not be displayed on their respective source pages.

You can easily re-create the highlights by opening the book page or article, selecting the text, and clicking “Highlight.”

Citations (0)
Some of your citations are legacy items.

Any citation created before July 30, 2012 will labeled as a “Cited page.” New citations will be saved as cited passages, pages or articles.

We also added the ability to view new citations from your projects or the book or article where you created them.

Notes (0)
Bookmarks (0)

You have no saved items from this article

Project items include:
  • Saved book/article
  • Highlights
  • Quotes/citations
  • Notes
  • Bookmarks
Notes
Cite this article

Cited article

Style
Citations are available only to our active members.
Sign up now to cite pages or passages in MLA, APA and Chicago citation styles.

(Einhorn, 1992, p. 25)

(Einhorn 25)

1

1. Lois J. Einhorn, Abraham Lincoln, the Orator: Penetrating the Lincoln Legend (Westport, CT: Greenwood Press, 1992), 25, http://www.questia.com/read/27419298.

Cited article

Risk Assessment: Focusing on the Operator
Settings

Settings

Typeface
Text size Smaller Larger
Search within

Search within this article

Look up

Look up a word

  • Dictionary
  • Thesaurus
Please submit a word or phrase above.
Print this page

Print this page

Why can't I print more than one page at a time?

Full screen

matching results for page

Cited passage

Style
Citations are available only to our active members.
Sign up now to cite pages or passages in MLA, APA and Chicago citation styles.

"Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences." (Einhorn, 1992, p. 25).

"Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences." (Einhorn 25)

"Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences."1

1. Lois J. Einhorn, Abraham Lincoln, the Orator: Penetrating the Lincoln Legend (Westport, CT: Greenwood Press, 1992), 25, http://www.questia.com/read/27419298.

Cited passage

Welcome to the new Questia Reader

The Questia Reader has been updated to provide you with an even better online reading experience.  It is now 100% Responsive, which means you can read our books and articles on any sized device you wish.  All of your favorite tools like notes, highlights, and citations are still here, but the way you select text has been updated to be easier to use, especially on touchscreen devices.  Here's how:

1. Click or tap the first word you want to select.
2. Click or tap the last word you want to select.

OK, got it!

Thanks for trying Questia!

Please continue trying out our research tools, but please note, full functionality is available only to our active members.

Your work will be lost once you leave this Web page.

For full access in an ad-free environment, sign up now for a FREE, 1-day trial.

Already a member? Log in now.