This report summarizes Nuclear Regulatory Commission (NRC) activities relating to new nuclear power plant initiatives. The time frame covered by this report is June 1, 2006 to June 30, 2007.

RECENT NRC ACTIVITY RELATED TO NEW REACTOR LICENSING

I. INTRODUCTION

Momentum in NRC activity related to new plant initiatives, spurred by the Energy Policy Act of 2005 (EPAct) incentives, continues.1 Activities of the NRC in support of, and preparation for, these new nuclear power plant initiatives fall into three major categories: (1) activities related to Early Site Permits (ESPs); (2) activities related to Design Certification; and (3) activities in preparation for reviewing new combined license (COL) applications.

II. EARLY SITE PERMITS

The past year saw continued progress by the NRC in the issuance and review of ESPs. The purpose of the ESP process is to allow applicants to have the safety, environmental protection, and emergency preparedness aspects of prospective sites for new plants reviewed independent of a specific nuclear plant design.2 The ESP, which is initially valid for no less than ten and no more than twenty years, "also allows for a limited work authorization to perform non-safety site preparation activities, subject to redress, in advance of issuance of a [COL]."3

A. ESPs Issued

The NRC approved issuance of ESPs to Exelon Generating Company, LLC (Exelon) and System Energy Resources, Inc. (SERI), a subsidiary of Entergy Corporation, on March 8, 2007 and April 27, 2007, respectively. Exelon, which had submitted its initial ESP application to the NRC on September 25, 2003, was issued an ESP for the Clinton site, approximately six miles east of the city of Clinton, Illinois, "co-located with the existing Clinton Power Station."4 The Clinton ESP supports a future application to construct and operate additional nuclear power reactors at the ESP site with a total nuclear generating capacity of up to 6800 megawatts thermal (MWt).5 SERI, which had submitted its initial ESP application to the NRC on October 16, 2003, was issued an ESP for the Grand Gulf site located near Port Gibson, Mississippi, approximately twenty five miles south of Vicksburg, Mississippi, and adjacent to the existing Grand Gulf Nuclear Station operated by Entergy Operations, Inc.6 The SERI ESP supports a future application to construct and operate additional nuclear unit(s) at the ESP site, with total nuclear generating capacity of up to 8600 MWt, with a maximum 4300 MWt per unit.7

B. Pending ESP Applications

There are currently two pending ESP applications, one submitted by Dominion Nuclear North Anna, LLC for the North Anna ESP site, and the other by Southern Nuclear Operating Company (SNC) for property located near the Vogtle nuclear power plant about twenty three miles southeast of Augusta, Georgia.

The Dominion application is currently before the Atomic Safety and Licensing Board (ASLB), which held evidentiary hearings to consider issues relevant to the ESP in Spring 2007. A decision by the ASLB is expected in August 2007, with a final decision by the NRC following in December 2007.8

SNC submitted its ESP application for the Vogtle site on August 15, 2006. On September 19, 2006, the NRC notified SNC of its acceptance of the Vogtle ESP application and commencement of its detailed comprehensive review of the application.9 SNC subsequently modified its application on November 13, 2006, bringing the proposed new plant in conformance with the orientation proposed by other nuclear utilities who were considering construction of multiple new reactor plants of the same type proposed in the Vogtle ESP application.10 The notice of availability for the Draft Environmental Impact Statement (EIS) has been scheduled for July 7,2007.11

III. DESIGN CERTIFICATION

Momentum also continued in the NRC design certification process for new nuclear plant design.12 Reactors that have received final design approval from the NRC in recent years include Westinghouse Electric Company's AP600 and API000 designs, certified in 1999 and 2006, respectively, and GE Nuclear Energy's U.

The rest of this article is only available to active members of Questia

Sign up now for a free, 1-day trial and receive full access to:

  • Questia's entire collection
  • Automatic bibliography creation
  • More helpful research tools like notes, citations, and highlights
  • Ad-free environment

Already a member? Log in now.

Notes for this article

Add a new note
If you are trying to select text to create highlights or citations, remember that you must now click or tap on the first word, and then click or tap on the last word.
One moment ...
Project items

Items saved from this article

This article has been saved
Highlights (0)
Some of your highlights are legacy items.

Highlights saved before July 30, 2012 will not be displayed on their respective source pages.

You can easily re-create the highlights by opening the book page or article, selecting the text, and clicking “Highlight.”

Citations (0)
Some of your citations are legacy items.

Any citation created before July 30, 2012 will labeled as a “Cited page.” New citations will be saved as cited passages, pages or articles.

We also added the ability to view new citations from your projects or the book or article where you created them.

Notes (0)
Bookmarks (0)

You have no saved items from this article

Project items include:
  • Saved book/article
  • Highlights
  • Quotes/citations
  • Notes
  • Bookmarks
Notes
Cite this article

Cited article

Style
Citations are available only to our active members.
Sign up now to cite pages or passages in MLA, APA and Chicago citation styles.

(Einhorn, 1992, p. 25)

(Einhorn 25)

1

1. Lois J. Einhorn, Abraham Lincoln, the Orator: Penetrating the Lincoln Legend (Westport, CT: Greenwood Press, 1992), 25, http://www.questia.com/read/27419298.

Cited article

Report of the Nuclear Energy Committee
Settings

Settings

Typeface
Text size Smaller Larger
Search within

Search within this article

Look up

Look up a word

  • Dictionary
  • Thesaurus
Please submit a word or phrase above.
Print this page

Print this page

Why can't I print more than one page at a time?

Full screen

matching results for page

Cited passage

Style
Citations are available only to our active members.
Sign up now to cite pages or passages in MLA, APA and Chicago citation styles.

"Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences." (Einhorn, 1992, p. 25).

"Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences." (Einhorn 25)

"Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences."1

1. Lois J. Einhorn, Abraham Lincoln, the Orator: Penetrating the Lincoln Legend (Westport, CT: Greenwood Press, 1992), 25, http://www.questia.com/read/27419298.

Cited passage

Welcome to the new Questia Reader

The Questia Reader has been updated to provide you with an even better online reading experience.  It is now 100% Responsive, which means you can read our books and articles on any sized device you wish.  All of your favorite tools like notes, highlights, and citations are still here, but the way you select text has been updated to be easier to use, especially on touchscreen devices.  Here's how:

1. Click or tap the first word you want to select.
2. Click or tap the last word you want to select.

OK, got it!

Thanks for trying Questia!

Please continue trying out our research tools, but please note, full functionality is available only to our active members.

Your work will be lost once you leave this Web page.

For full access in an ad-free environment, sign up now for a FREE, 1-day trial.

Already a member? Log in now.