Newspaper article St Louis Post-Dispatch (MO)

Road Construction

Newspaper article St Louis Post-Dispatch (MO)

Road Construction

Article excerpt

The following list reports on major road construction projects that could cause traffic congestion. Information for the list was provided by the Missouri Highway and Transportation Department, the Illinois Transportation Department and construction contractors.

MISSOURI South County:

I-55: From I-270 to Butler Hill Road, southbound traffic is shifted to the right. Northbound I-55 traffic from I-270 to Butler Hill will shift to the left.

From Butler Hill Road to the Meramec River, lanes will close in off-peak hours.

Route 141: From south of I-44 to San Simeon Way, traffic will be delayed because road-construction vehicles will be crossing the roadway in off-peak hours.

Watson Road: Between Elm Avenue and Edgar Road, lanes may close in off-peak hours.

Telegraph Road: North and south of the Meramec River bridge, traffic has been placed on temporary bypass; speed limit 30 mph.

West County:

Manchester: From I-270 to Barrett Station road, lanes will be closed in off-peak hours. …

Search by... Author
Show... All Results Primary Sources Peer-reviewed

Oops!

An unknown error has occurred. Please click the button below to reload the page. If the problem persists, please try again in a little while.