Newspaper article Pittsburgh Post-Gazette (Pittsburgh, PA)

1. Fort Pitt Tunnel: Overnight Work Possible. [Derived Headline]

Newspaper article Pittsburgh Post-Gazette (Pittsburgh, PA)

1. Fort Pitt Tunnel: Overnight Work Possible. [Derived Headline]

Article excerpt

1. Fort Pitt Tunnel: Overnight work possible.

2. Blackburn Road/Sewickley Heights:The road has reopened at Thawmont Drive following a four-month project.

3. Boulevard of the Allies/Uptown/Oakland:The inbound lane closure between Miltenberger and Marion streets has ended so Allies can be used as a detour for this week's Parkway East inbound closure. The lane will be closed again for a short time next year. The outbound lane restriction between Marion and Van Braam Street near UPMC Mercy remains in place through mid-January.

4. Parkway North/Interstate 279: Daylight shoulder and ramp work possible.

5. Forbes Avenue/Oakland: Paving as part ofextensive redesign and repairs.

6. Route 837/Whitaker/West Mifflin:Single-lane restrictions in the area leading to the Rankin Bridge for a project to last through late December. …

Search by... Author
Show... All Results Primary Sources Peer-reviewed

Oops!

An unknown error has occurred. Please click the button below to reload the page. If the problem persists, please try again in a little while.