Doe Transmission Corridor Designations & Ferc Backstop Siting Authority: Has the Energy Policy Act of 2005 Succeeded in Stimulating the Development of New Transmission Facilities?

By Swanstrom, Debbie; Jolivert, Meredith M. | Energy Law Journal, July 1, 2009 | Go to article overview

Doe Transmission Corridor Designations & Ferc Backstop Siting Authority: Has the Energy Policy Act of 2005 Succeeded in Stimulating the Development of New Transmission Facilities?


Swanstrom, Debbie, Jolivert, Meredith M., Energy Law Journal


Synopsis: Historically, the Federal Energy Regulatory Commission (FERC) lacked authority over the siting of electric transmission lines. The FERC's siting role was limited to issuing certificates of public convenience and necessity for the construction of interstate natural gas transportation facilities. State agencies, in contrast, authorized the construction of electric transmission facilities. This regulatory landscape shifted, however, when the Energy Policy Act of 2005 (EP Act 2005) was enacted.

Recognizing the need for new transmission infrastructure in many areas of the country, the U.S. Congress established a four-part approach to the siting of new transmission facilities in congested areas. First, Congress directed the Secretary of the U.S. Department of Energy (DOE) to study transmission congestion. Second, based on the results of such study, Congress vested the Secretary of the DOE with authority to designate National Interest Electric Transmission Corridors (NIETCs). NIETCs are geographic areas experiencing transmission congestion that adversely affects consumers and wherein the relief of congestion would promote this country's energy independence, national security, and economic growth. Third, Congress allowed the states the opportunity to act first on applications for authority to site new transmission facilities within NIETCs. Fourth, Congress empowered the FERC with new backstop authority to site transmission lines within NIETCs under certain circumstances where, for example, a state fails to act quickly enough or imposes onerous conditions which effectively destroy the economic viability or benefits of a project.

Exercising its new authority, the DOE designated two, large NIETCs spanning several Southwestern and Mid-Atlantic States, which are now being challenged in Federal Court. The FERCs backstop siting regulations also were challenged, resulting in a Federal Court decision vacating those regulations in significant part. Moreover, the only utility to commence the process of seeking FERC backstop siting approval for a new transmission project has since announced that it no longer intends to pursue a FERC permit.

While the mere threat of potential federal preemption may have some influence on the siting behavior of states, by inducing them to approve more certificate applications at a faster pace or engage in greater regional cooperation, the provisions granting FERC siting authority in NIETCs do not appear to be a driving force for new transmission investments. Instead, other factors such as transmission rate incentives, authorized under Section 1241 of EP Act 2005, appear to have a much greater impact on the development of new transmission facilities. Since the adoption of the FERC's Final Rule on transmission rate incentives, the FERC has approved some form of rate incentives for over thirty transmission projects.

This article addresses recent legislative, regulatory, and litigation developments affecting the siting of transmission projects across the country, including remaining barriers to infrastructure development and actions being taken to overcome those barriers. We examine factors affecting the development of new transmission projects post-EPAct 2005, including the downturn in the U.S. economy, access to and the cost of capital, transmission rate incentives, the availability of federal grants or loans, the siting process, cost allocation disputes, renewable energy standards, reliability standards, and regional transmission planning.

Our research found that, despite the recent downturn in the U.S. economy, the number of applications filed with state commissions and the amount of investments made in transmission projects appear to have increased post-EPAct 2005. We also found that: (1) more applications appear to have been filed with state commissions for projects outside of NIETCs than for projects inside NIETCs; and (2) many state commissions acted on applications in approximately one year, both pre-and post-EPAct 2005. …

The rest of this article is only available to active members of Questia

Already a member? Log in now.

Notes for this article

Add a new note
If you are trying to select text to create highlights or citations, remember that you must now click or tap on the first word, and then click or tap on the last word.
One moment ...
Default project is now your active project.
Project items

Items saved from this article

This article has been saved
Highlights (0)
Some of your highlights are legacy items.

Highlights saved before July 30, 2012 will not be displayed on their respective source pages.

You can easily re-create the highlights by opening the book page or article, selecting the text, and clicking “Highlight.”

Citations (0)
Some of your citations are legacy items.

Any citation created before July 30, 2012 will labeled as a “Cited page.” New citations will be saved as cited passages, pages or articles.

We also added the ability to view new citations from your projects or the book or article where you created them.

Notes (0)
Bookmarks (0)

You have no saved items from this article

Project items include:
  • Saved book/article
  • Highlights
  • Quotes/citations
  • Notes
  • Bookmarks
Notes
Cite this article

Cited article

Style
Citations are available only to our active members.
Buy instant access to cite pages or passages in MLA, APA and Chicago citation styles.

(Einhorn, 1992, p. 25)

(Einhorn 25)

1. Lois J. Einhorn, Abraham Lincoln, the Orator: Penetrating the Lincoln Legend (Westport, CT: Greenwood Press, 1992), 25, http://www.questia.com/read/27419298.

Cited article

Doe Transmission Corridor Designations & Ferc Backstop Siting Authority: Has the Energy Policy Act of 2005 Succeeded in Stimulating the Development of New Transmission Facilities?
Settings

Settings

Typeface
Text size Smaller Larger Reset View mode
Search within

Search within this article

Look up

Look up a word

  • Dictionary
  • Thesaurus
Please submit a word or phrase above.
Print this page

Print this page

Why can't I print more than one page at a time?

Help
Full screen

matching results for page

    Questia reader help

    How to highlight and cite specific passages

    1. Click or tap the first word you want to select.
    2. Click or tap the last word you want to select, and you’ll see everything in between get selected.
    3. You’ll then get a menu of options like creating a highlight or a citation from that passage of text.

    OK, got it!

    Cited passage

    Style
    Citations are available only to our active members.
    Buy instant access to cite pages or passages in MLA, APA and Chicago citation styles.

    "Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences." (Einhorn, 1992, p. 25).

    "Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences." (Einhorn 25)

    "Portraying himself as an honest, ordinary person helped Lincoln identify with his audiences."1

    1. Lois J. Einhorn, Abraham Lincoln, the Orator: Penetrating the Lincoln Legend (Westport, CT: Greenwood Press, 1992), 25, http://www.questia.com/read/27419298.

    Cited passage

    Thanks for trying Questia!

    Please continue trying out our research tools, but please note, full functionality is available only to our active members.

    Your work will be lost once you leave this Web page.

    Buy instant access to save your work.

    Already a member? Log in now.

    Oops!

    An unknown error has occurred. Please click the button below to reload the page. If the problem persists, please try again in a little while.